ENVIRONMENTAL IMPACT ASSESSMENT

Integrated Environmental  Consultants (Sabah) are registered with the Environmental Protection Department of Sabah(EPD) as an Environmental consultancy Firm, and two of our lead consultants are registered as individual consultants with both the EPD and the Federal Department of Environment thus covering the scope of most environmental studies. 
 

 

     

EIA Project List

Project Title
 
Details
  Year
  Preparation of EIA for exclusive coastal tourism development in a remote area of Sabah.   
2005
 
  Preparation of EIA for exclusive island tourism development.   
2006
 
  Assessment of impacts of minor oil spill in mangrove lined river.   
2005
 
  EIA for tourism development in 40 hectares of pristine mangrove.  Mitigations involved establishment of research centre.   
2006
 
  Preparation of Erosion and Sediment Control Plan in support of EIA for reopening of a rock quarry.   
2006
 
  Preparation of EIA for mixed residential and commercial development over large area, and involving substantial earthworks for site preparation.   
2006
 
  Preparation of EIA for hilltop tourism development.  Developer's requirement to fulfill all aspects of ecotourism development.   
2007
 
  Preparation of PMM (Proposal for Mitigation Measures) for tourism development; extension of Kulambu Beach.   
2007
 
  Preparation of PMM (Proposal for Mitigation Measures) for tourism development; further extension of Kulambu Beach.   
2007
 
  Preparation of EIA for school construction involving extensive earthworks adjacent to established forest reserve.   
2007
 
  Preparation of EIA for school construction involving large earthworks volume for site preparation adjacent to coast.   
2007
 
  Assessment of current environment on site proposed for aquaculture development and identification of alternative sites and technology  
2007